In 2019, the Government of India launched the second phase of the Faster Adoption and Manufacturing of Electric and Hybrid Vehicles (FAME II) scheme to bring electric vehicles (EVs) at par with internal combustion engine (ICE) vehicles in terms of affordability.
This study was commissioned by Karnataka Electricity Regulatory Commission (KERC) to identify key implementable strategies for the state of Karnataka for achieving the objectives of 24x7 Power for All The study describes the power supply scenario in the State including estimates for future energy demand The status of 24x7 power supply is analysed along the dimensions of access (electrification), adequacy (per capita consumption), affordability (cost of supply), availability (duration of supply), and reliability Future plans for generation capacity are analysed to determine the range of foreseeable shortfalls till Financial Year (FY) 2020 Transmission capacity augmentation, renewable energy and energy efficiency options available to meet future demand are discussed in detail The report concludes with the strategies that Karnataka should focus on in order to achieve the objectives of 24x7 Power for All.
India’s present installed capacity, 1,62,366.
India’s present installed capacity, 1,62,366.
Energy access is a critical challenge in the Indian power sector.
Energy is central to almost every challenge we face today — security, climate change, food production, or job creation.
Low-cost sensors (LCSs) that measure PM2.
Bengaluru, India’s ‘Garden City’, is facing a growing dilemma.